Rail & Road Detailed Project

Preliminary / Final Location Survey, Feasibility Study & Detailed Project Report & Detailed Alignment and Bridge Design

New Passenger Railway Line Setup



  • Final Location Survey, Detailed Alignment and Bridge Designing, Land Plans, Geotechnical Investigation, Waterway calculations, etc. in connection with Construction of 157 Km New Broad Gauge (BG) Railway line from Chhoteudaipur to Dhar for Western Railway (Construction), Vadodara.

  • Final Location Survey, Detailed Alignment and Bridge Designing, Land Plans, Geotechnical Investigation, Waterway calculations, etc. in connection with Construction of 205 Km New Broad Gauge (BG) Railway line from Dahod to Indore for Western Railway (Construction), Vadodara.


Private Railway Sidings



Aluminum Sector



  • Final Location Survey, Engineering and Traffic surveys and Detailed Project Report including Railway approvals for about 28 Km long Railway line and Structures for Alumina Plant Railway Siding at Lanjigarh, Orissa for Vedanta Aluminum Ltd.

  • Final Location Survey and Report of about 23 km Railway line and Structures for transportation of coal from Utkal E Block for National Aluminum Company Ltd (NALCO) at Dhamanjodi, Orissa.

  • Consultancy Services for preparation & approval of Techno Economic Feasibility Report, Draft DPR and Final approval of DPR for Vedanta Aluminium Ltd., Bidhanbag, Dist. Burdwan, West Bengal.


Oil Sector



  • Feasibility studies including Railway approvals for Private Railway POL siding at Mandirhasud / Raipur, Chhattisgarh of Indian Oil Corporation Ltd.

  • DPR including Railway approvals for Private Railway POL siding at Paradeep, Orissa of Indian Oil Corporation Ltd.

  • Preliminary Survey and feasibility study for setting up LPG Rail Loading Facilities at LPG Terminal Baroda (Dhumad), Gujarat of Indian Oil Corporation Ltd.

  • Preliminary Survey and feasibility study for setting up LPG Rail Loading Facilities at LPG Terminal Paradeep, Orissa of Indian Oil Corporation Ltd.

  • Pre-feasibility, Final Location Survey, Designing & Approval of DPR from Railways of POL Terminal Railway Siding at Lakholi/Raipur, Chhattisgarh for Indian Oil Tanking Ltd.

  • Preliminary Survey & Feasibility Study for setting up Tank Wagon Rail Unloading Facilities for petroleum products at Jammu (J&K) for Indian Oil Corporation Ltd.

  • Feasibility Study Report for POL Unloading Railway siding taking off from Suchipind (Jalandhar) station of Northern Railway for Hindustan Petroleum Corporation Ltd.


Petroleum Refinery Sector



  • Pre-feasibility, Final Location Survey, Designing & Approval of DPR from Railways of Solid Handling Railway Siding at Jamnagar, Gujarat for M/s Reliance Petroleum Ltd.

  • Detailed Project Report for Augmentation of existing Railway Siding of Essar Oil Ltd for movement of coal for M/s Essar Bulk Terminal Salaya Ltd.


Steel Sector



  • Pre-feasibility, Final Location Survey, Designing & Approval of DPR from Railways of Private Railway Siding at Kumhari / Raipur, Chhattisgarh Shri Bajrang Power & Ispat Ltd.

  • Pre-feasibility, Obtaining RTC, Final Location Survey, Designing & Approval of DPR from Railways of Private Railway Siding for Welspun Corporation Ltd (Pipe & Coil Mills Division), Anjar (Gujarat).

  • Conducting Detailed Feasibility Study for connecting New Railway Siding of SESA Industries in Amona, Goa to suitable station on Konkan Railway Line for Sesa Sterlite Ltd.


Thermal Power Plant



  • Final Location Survey, DPR, Yard Design, Approval from Railways, etc for Private Railway Siding & Merry-Go-Round (MGR) Track in IGSTPP of APCPL (NTPC), Jhajjar, taking off from Jhajjar station on North Western Railway for RITES Ltd, Gurgaon.

  • Final Location Survey, DPR, Yard Design, Approval from Railways, etc for Private Railway Siding & Merry-Go-Round (MGR) Track in MTPP of NTPC, Mauda taking off from Chacher station on South East Central Railway for RITES Ltd, Nagpur.

  • Feasibility for Lateral/Transverse displacement of Coal by New Car Dumper/ Tippler, Yard Design, Approval of DPR from Railways, etc for Railway Connectivity of Uchpinda Thermal Power Plant to Kharsia Railway Station on South East Central Railway for R.K.M. Powergen Pvt. Ltd., Chennai.

  • Obtaining RTC, Final location survey, Designing, Approval of DPR from Railways etc for Private Railway siding & MGR Track in Kalisindh Power Station of Rajasthan Rajya Vidyut Utpadan Nigam Ltd, taking off from Jhalawar station on West Central Railway for IRCON International Ltd, New Delhi.

  • Preparation of Conceptual Plan, Feasibility Report & Detailed Project Report with Wagon Shifter for New Captive Railway Siding taking off from Bhupdeopur station on South East Central Railway for Visa Power Ltd, Kolkata.

  • Validation of DPR for Proposed Railway Siding with takes off from Gumgaon Railway station for Thermal Power Plant of Abhijit MADC Nagpur Energy, Nagpur.

  • Preparation of Conceptual Plan, Feasibility Report for New Railway Siding taking off from Barud Station to Revapur Thermal Power Plant of NHDC Ltd. for RITES Ltd, Nagpur

  • Feasibility Study Report for Railway connectivity from proposed Nagpur- Chhindwara new BG line to Pench Thermal Power plant near Chhindwara for Adani Pench Power Ltd, Ahmedabad.

  • Consultancy Services for Railway Siding of Essar Mahan Power Plant at Singrauli station on East Central Railway for Essar Logistics Ltd, Hazira.

  • Consultancy Services for Rail connectivity for Essar Mahan Power Plant from Gajrabahara or any other station on West Central Railway for Essar Logistics Ltd, Hazira.

  • Detailed Feasibility Studies for Augmentation of existing MGR System of NTPC Unchahar Power Plant for NTPC, Noida.

  • Detailed Project Report for Railway siding from Nardana Station on Western Railway for Shirpur Power Pvt Ltd, Ahmedabad.

  • Detailed Project Report for Augmentation of existing in- plant yard & ‘Y’ connection to PRPM Station of Northern Railway for Rosa Power Supply Co. Ltd (Reliance ADA Group) for Reliance Power Ltd, Mumbai.

  • Detailed Project Report for Augmentation of existing in- plant yard of Rosa Power Supply Co. Ltd for Loading of Fly Ash for Reliance Infrastructure Ltd (Reliance ADA Group), Mumbai.


Coal Block



  • Preparation of Feasibility Report & Detailed Project Report for New Railway Siding taking off from Gajarabahra Station in West Central Railway to Dongrital-II Coal Block of MPJCL for RITES Ltd, Nagpur


Cement Plants



  • Approval from Railways for Feasibility Report and Detailed Project Report for Railway siding for proposed Cement Grinding Unit at Village; Osara (M.P) taking off from Jhalawar Road Station in West Central Railway for Ambuja Cements Ltd, New Delhi.

  • Approval from Railways for Detailed Project Report for Railway siding for existing Cement Grinding Unit at Village Nalagarh, District Solan, (HP); taking off from Mid Section on Ghanauli- Bharatgarh section of Northern Railway for Ambuja Cements Ltd, Panchkula (Haryana).

  • Detailed Engineering for proposed Railway Siding from Ras Station of North Western Railway for Ambuja Cements Ltd., Rabriyawas (Rajasthan).
    Approval from Railways for Detailed Project Report, Engineering Scale Plan for proposed Railway Siding of Ambuja Cements Ltd, Marwar Mundwa (Rajasthan).

  • Detailed Project Report for Augmentation of existing in- plant yard of Kundanganj Cement Plant for Unloading of Fly Ash for Reliance Infrastructure Ltd (Reliance ADA Group), Mumbai.


Renewable Energy



  • Survey and Design of Vasant Sahakari Sakhar Karkhana Ltd., Pusad for constructing Power Plant on Renewable Energy for Skyzen Infrabuild Pvt. Ltd., Mumbai.


Port



  • Preparation of Feasibility Report, Detailed Project Report, Engineering Scale Plan and approvals from Railways for proposed Rail connectivity from Tuna Port to Back up area, taking off from Gandhidham- Kandla line for Kandla Port Trust

  • Preparation of Feasibility Report, Detailed Project Report, Engineering Scale Plan and approvals from Railways for Rail connectivity of proposed Private Nargol Port in South Gujarat taking off from Mumbai Central- Surat line of Western Railway for Nargol Port Rail Links Pvt Ltd, Ahmedabad.


Inland Container Depot (ICD)



  • Preparation of Detailed Project Report, Engineering Scale Plan and approvals from Railways for Railway siding of ICD taking off from Viramgam station of Western Railway for Gateway Rail Freight Ltd, New Delhi.