Feasibility Study and Preliminary Designs for the 550KM Greenfield Trans-ECOWAS Railway Line from Aflao to Elubo, Ghana (MoRD)

    • Route identification and selection of optimal alignment
    • Field investigations including geo technical and hydrological studies
    • Design of alignment and rail related infrastructure (bridges,
    • culverts, stations, workshops, etc.)
    • Bill of quantities and lifecycle cost estimates
    • Environmental/Social Impact Assessment
    • Passenger and freight traffic study
    • Land acquisition assessment
    • Financial analysis and PPP structuring
    • Economic analysis
    • Regular in person and online workshops on study progress and findings

Service/Sub-Service Tag

  • Detailed Engineering
  • Engineering
  • Environmental and Social Impacts Assessments
  • Financial & Economical Assessments
  • Infrastructure Studies, Advisory, Design
  • Master Planning & Feasibility Assessments
  • PPP
  • PPPs And Transaction Advisory
  • Procurement Strategy
  • Site Investigations
  • Technical Assistance, Institutional Strengthening and Capacity Development
  • Traffic Assessments
  • Value Engineering