Study for carrying out fly ash transportation from ash pond through rail mode connecting the same to existing railway siding/rail routes at all coal fired thermal power stations of MPPGCL

    • Site condition assessment of all four plants
    • Field survey of the existing rail route from silos to railway line
    • Study of the water consumption, energy consumption, environmental, and pollution control norms to ensure compliance
    • Identified the source of water/wastewater for meeting the excess water requirement for misting / sprinkling in co- ordination with concerned plant officials
    • Prepared detailed diagrams including Layout Plan, Water Balance Diagram, etc. as necessary
    • prepared plant-wise technical specifications
    • Preparation of tender documents including Instructions to the Bidders, Pre-Qualification Requirement, Tender Evaluation criteria, Annexure & Schedules, Price Bid Template etc.

Service/Sub-Service Tag

  • Design of Water Balance
  • Detailed Design
  • Feasibility Study
  • Fly Ash Transportation
  • Procurement Strategy
  • Procurement Strategy and Administration
  • Site Investigations
  • Survey
  • Traffic Assessments