Consultancy Services for Feasibility Study & approval’ from Railways for Augmentation of Railway System for Feroze Gandhi Unchahar Thermal Power Project Stage- IV (1 X 500 MW).

    • Conducted field surveys for augmentation of railway line facilities
    • Carried out survey of proposed alignment for railway spurs and Receipt and Dispatch yard, serving stations, crossing stations
    • Pegged out final alignment in the field for complete railway line including fixing firm central line pillars at suitable intervals and taking levels at suitable intervals along the proposed route including of bench marks
    • Prepared plan and L-section as per railway standards
    • Finalized co-ordinates for the proposed track hopper
    • Prepared a consolidated traffic study of coal and non-coal movement
    • Conducted in-depth study of the overall railway line system including the serving station and coal unloading facilities
    • Ascertained any additional facilities required inside the plant
    • Analyzed the requirement of locomotives for marshalling /shunting of rakes inside plant, recommended numbers and rating of locomotive required.
    • Finalized locations/coordinates of track hoppers/wagon tipplers and disposition of in haul and out haul tracks.
    • Prepared the necessary modification /alterations required in the in-plant receipt yard, serving stations, crossing stations, exchange yard etc.
    • Developed the construction methodology for execution of work
    • Recommended the operating regime for railway siding
    • Recommended procedures to deal with exigencies during shunting/marshalling
    • Studied additional personnel requirement
    • Provided recommendations on signaling and telecommunication and Overhead Equipment (OHE) facilities
    • Prepared plans for augmenting/modifying signaling and telecommunication facilities inside the plant
    • Prepared cost estimates for civil, electrical, signaling and telecommunication and OHE works
    • Liaised with Indian Railways for approval of the  Detailed Feasibility Report
    • Recommended suitable locations for the provision of an in-motion weighbridge for weighment of loaded/empty coal rakes
    • Reviewed all drawings prepared by NTPC