Engineering Consultancy for Railway Siding of proposed Internal Container Depot at Viramgam in Western Railway for Gateway Rail Freight Limited

    • Carried out total Station and station survey
    • Conducted CBR tests on disturbed soils
    • Prepared Engineering Scale Plan
    • Prepared detailed Bill of Quantities, cost estimates and specifications for tender documents
    • Prepared the Signal Inter Locking Plan
    • Obtained approval from concerned authority for weigh bridge installation, track construction and land licensing
    • Established detailed construction /erection methodology, execution plan and work schedule with construction contractors
    • Reviewed and approved work method and procedure
    • Finalized the construction code, standards and specifications etc and approved drawings
    • Construction Monitoring:
    • Reviewed contractors’ construction schedule and held review meetings to monitor the trend in schedule and progress
    • Reviewed site mobilization plan and monitored mobilization of required personnel, resources and equipment
    • Prepared monthly progress reports/exception reports highlighting the percentage completion of work and areas of concern with respect to schedule to be deployed.
    • Reviewed the Contractor’s construction and quality assurance plan and confirmed its compliance
    • Finalized the inspection and test plan
    • Audited and approved welding procedures and welder’s qualification procedure
    • Arranged and advised on track testing and trial runs
    • Organized inspection of completed works
    • Monitored safety procedures
    • Construction Inspection:
    • Audited documentation submitted by the construction contractors periodically
    • Provided oversight regarding the necessary arrangements for required field inspection and tests
    • Vetted As-Built Drawings submitted by contractors
    • Provided certification of measurements/milestone progress of site work

Service/Sub-Service Tag