Railway Study in connection with construction of New Broad Gauge line between Chotta Udaipur – Dhar of 157 kms

    • Consulted with stakeholders to inform traffic study and environmental and social concerns
    • Conducted route identification and selection of ‘optimum’ alignment
    • Design of plan and Profile (L -Section)
    • Field investigations including hydrological, geological, topographic and geotechnical surveys
    • Prepared preliminary designs for the permanent way, bridges, culverts, stations and workshops
    • Prepared the bill of quantities
    • Estimated and forecasted land use parameters such as population, employment, agricultural, mining, industries etc.
    • Assessed land requirements for the project and recommended the mode of acquisition
    • Prepared drawings of L-Section, plan and General Arrangement Drawings (GADs) of bridges, signaling and telecommunication, train management system, and rail operations
    • Developed the station building plan and designs for different classes of stations

Service/Sub-Service Tag

  • Detailed Design
  • Detailed Engineering
  • Feasibility Study
  • Site Investigations
  • Survey
  • Traffic Assessments