Study of Reliance’s Rail Infrastructure and Operations and Recommendations to Increase Efficiency and Reliability (Reliance)

    • Detailed study of existing rail facilities and operations
    • As-built drawings
    • Recommended improvements to operating points including automating signaling systems
    • Bill of quantities and lifecycle costs for automated signaling system
    • Report on signaling maintenance best practices and terms of reference for staff training
    • Recommended long-term strategies to improve operations and reduce maintenance costs such as electronic interlocking with a central control panel

Service/Sub-Service Tag

  • Detailed Engineering
  • Financial & Economical Assessments
  • Site Investigations
  • Traffic Assessments
  • Value Engineering