Study for carrying out fly ash transportation from ash pond through rail mode connecting the same to existing railway siding/rail routes at all coal fired thermal power stations of MPPGCL
Study for carrying out fly ash transportation from ash pond through rail mode connecting the same to existing railway siding/rail routes at all coal fired thermal power stations of MPPGCL